daisy crit



Above is the total rendering that was asked for us for today.

Daisy Had a lot of good criticism, we can summarize as follows:

- We should try to create better lighting quality within the levels
- We can do this by cutting out hexagons to create inner atriums
- We should develop the bracing system for the detail rendering
- We should also include a rendering that shows some interior walls
- We should continue to organize the program like we have above but more detailed
- We could shorten the columns at times so they shade more of the levels

Wednesday, February 25, 2009

Final Program

So after working on the program for a few hours, we finally decided and agreed on the program. That was because we believed our program has a lot of unresolved issues. We separated the different programs on different levels depending on its use. From there, we calculated the total square footage for each floor, added the 20% for circulation and walls, then took the total and figured out how many hexagons was needed for each floor.



Program:


6th Floor
Space Elevator (undecided)

5th Floor
Infrastructure 3000sq
Medical 6000sq
Religious 1500sq

10500
2100
12600_49

4th Floor
Administration 2000sq
Large Conference Room 1500sq
Small Conference Room 1500sq
Offices 32 @ 300-400sq

17800
3560
21360_82

3rd Floor
Laboratory 16 @ 2000sq

32000
6400
38400_148

2nd Floor
Hotel Rooms 60 @ 520sq
Restaurant 6000sq
Lounge 1000sq

38200
7640
45840_176

1st Floor
Public Admin (Ticketing, Passport control) 1000sq
Lobby 3000sq
Lounge 2000sq
Visitors Information Center 500sq
Recreation (Gardens / Running /Walking Paths) 3000sq
Educational 1000sq
Theater 3500sq
Shops 12 @ 500sq ea
Restaurant 2 @ 6000sq
Ferry Dock 800sq
Helicopter Pad 500sq
Workshops 500sq

33800
6760
40560_156

First number is square footage.
Second one is 20% for circulations
Third one is total sq __ number of Hexagons

Monday, February 23, 2009

Development Update

Here are the renderings we had for our studio display on wednesday.

From here we went on to
Reorganize our levels and program.
Detail the bracing holding the whole system together.
Detail a railing system that works better with the shading towers.
Giving more attention to detail as far as the interior conditions and floor treatment.

Here are the original renderings:







Here is our new railings, and deck treatment:



this is the section we have in mind now, considering the bracing that's going to keep the whole system rigid using the same angled steel that's making up the railings.



We also updated our shading towers by removing the point at the end, i guess well choose between keeping them or not in the near future.



We plan on having a view to depict the thick glass forest effect the shading towers create but this view hasn't been fully developed yet. Here's a start.