Final Program

So after working on the program for a few hours, we finally decided and agreed on the program. That was because we believed our program has a lot of unresolved issues. We separated the different programs on different levels depending on its use. From there, we calculated the total square footage for each floor, added the 20% for circulation and walls, then took the total and figured out how many hexagons was needed for each floor.



Program:


6th Floor
Space Elevator (undecided)

5th Floor
Infrastructure 3000sq
Medical 6000sq
Religious 1500sq

10500
2100
12600_49

4th Floor
Administration 2000sq
Large Conference Room 1500sq
Small Conference Room 1500sq
Offices 32 @ 300-400sq

17800
3560
21360_82

3rd Floor
Laboratory 16 @ 2000sq

32000
6400
38400_148

2nd Floor
Hotel Rooms 60 @ 520sq
Restaurant 6000sq
Lounge 1000sq

38200
7640
45840_176

1st Floor
Public Admin (Ticketing, Passport control) 1000sq
Lobby 3000sq
Lounge 2000sq
Visitors Information Center 500sq
Recreation (Gardens / Running /Walking Paths) 3000sq
Educational 1000sq
Theater 3500sq
Shops 12 @ 500sq ea
Restaurant 2 @ 6000sq
Ferry Dock 800sq
Helicopter Pad 500sq
Workshops 500sq

33800
6760
40560_156

First number is square footage.
Second one is 20% for circulations
Third one is total sq __ number of Hexagons